Before
your church gets involved in a building project, make sure you
count the cost.
By
Jeff Dunn - expanded upon by ChurchPlansForLess
The decision to
expand St. James United Methodist Churchs building was an
easy one to make.
We knew it
was time to expand, says Jeffrey Johnson, associate pastor
of the Tulsa, Oklahoma, church, when we couldnt squeeze
one more child in a Sunday school classroom.
For others the decision
to build is not as clear. South Dayton (Ohio) Presbyterian leased
an auditorium from a local Seventh-day Adventist school for 6-1/2
years before breaking ground for their own complex. We could
have waited another year to collect more funds, reflects
Don Ward, pastor of South Dayton Presbyterian.
Both Johnson and
Ward confess to making mistakes during the planning and building
process. These pastors, along with several construction and financial
planning experts, talked with MINISTRIES TODAY about what to do
and what not to do when launching a church building project.
Here are 10 mistakes
often made by ministers in building or expanding their churches.
We hope you can avoid the same pitfalls. (Click on the list below
to view more info.)
Mistake
#1. Failure to conduct a needs analysis.
Mistake #2. Selecting the wrong architect
or builder.
Mistake #3. Relying on the architects
cost estimate.
Mistake #4. Improper site selection.
Mistake #5. Failure to plan for adequate parking.
Mistake #6. Unrealistic projection of income
or inadequate cash on hand.
Mistake #7. Getting on the bad side of city
government.
Mistake #8. Allowing the project to overwhelm
your life.
Mistake #9. Not praying for the construction
workers.
Mistake #10. Waiting to celebrate until the
building is complete.
Mistake # 11. Ordering that "On Sale
for a Limited Time Steel Building Package".
Mistake # 12. Failing to check for the need
of a Registered Architect.
Mistake #1. Failure to conduct a needs
analysis.
Yes, you realize you need more space. But what kind of space do
you need? Can existing space be utilized, or will you have to
add to your building? Do you have the land to expand?
These questions
and others should be answered during a needs analysis or feasibility
study. Such a study should be done by an architect before any
other phase- even before the selection of an architect to design
your plans.
Having an
unbiased, outside source do a feasibility study allows a better
view of the churchs needs, says Larry Barnhill, vice president
of A-E Technologies. Once a congregation gets beyond their
emotions and feelings, they can see the facts. Otherwise, you
can end up with a church designed by a committee.
Barnhill, vice president
of operations for the 10-year-old company, cautions pastors not
to confuse planning with plans.
Planning,
he explains, is taking us from where we are to where we
want to be. A plan- the drawing of a building- is where many architects
want to start. The architect asks, What do you want to build?
What most churches need is someone to ask, What do you need-
and why?
Dont
think of building what you need now, says Johnson. Plan
to build what you will need five years from now. Johnson
explains that shortly after the first phase of St. James
building was finished in 1988, they were already overcrowded in
classroom space. Wise use of space above several rooms allowed
for a temporary solution until the second phase could begin in
1996.
Build a building
that can be added onto, says Johnson. Start from the
end- what you want it all to look like- and work back. Picture
what the whole campus should look like after all the phases are
completed.
Churches are
the biggest tearer-uppers of asphalt in the country,
according to Brachial. They tear up a parking lot to add
to the building when they shouldnt have put the parking
lot there in the first place. You should plan your building for
future growth.
A healthy
church will grow, says Johnson enthusiastically. Build
your church to accommodate growth.
back
to top
Mistake #2. Selecting the wrong architect
or builder.
Barnhill believes it is imperative to choose a Christian architect.
His Christian
perspective allows him to ask the right questions, Barnhill
says, and allows him to understand the use of your building.
After all, a building is a tool for use in your ministry.
Ward chose a Christian
builder and trusted that as a Christian he would do everything
in an upright manner. Now he wishes he had not been so trusting.
The contractor was using money given him by Wards church
to pay subcontractors on other jobs. Money soon ran out for Wards
project.
If he had
been a secular contractor, says Ward, we would have
held his feet to the fire. Now I know that just because a worker
is Christian doesnt mean we should fail to hold him accountable.
Set up procedures and then stick to them. Dont take excuses.
Ward admits he did
not check the builders references closely enough. He suggests
checking the two or three most recent projects completed by the
builder rather than ones done several years ago.
If he has
any history of late payments, warns Ward, you dont
want anything to do with him, whether he is the lowest bidder
or not.
back
to top
Mistake #3. Relying on the architects
cost estimate.
Scott Rolfs, assistant vice president with B. C. Ziegler and Co.,
a firm specializing in church financing of large-dollar ($1 million
or more) projects, sees this problem arise constantly.
We look at
any number of multi-million dollar projects every week,
he says. The architect tells the church it is a $1.2 million
to $1.5 million project; then the bids come back from the builders
10 to 20 percent higher. The problem is the pastor has sold the
congregation on the architects price. The congregation gets
sticker shock when they are told what it will really
cost to build.
Then there are the
costs not written into the original plans that can end up adding
tens of thousands of dollars to the project- or shutting it down
completely. Things not foreseen by the architect, such as street
improvements or the addition of a traffic light, can drastically
increase the overall cost.
Who is going
to pay for the building redesign if it comes in over budget?
asks Barnhill. The architect should be willing to redesign
at no cost, even if that means starting over. Thats our
policy- its a matter of integrity. If the bid exceeds the
projected cost by 7 percent, well redesign at no cost to
the church.
back
to top
Mistake #4. Improper site selection.
Proper site selection is the key, says Ward. It makes all
the difference, he insists. We chose a site on a high-traffic
road. We get a lot of visitors just from drive-bys.
But it is a much
more difficult chore than it was a decade or so ago.
Gone are the
days when you could just go out, buy a plot of land and build
a church on it, says Barnhill. Now there are numerous
environmental issues to investigate.
Barnhill and Rolfs
both stress the importance of the completion of an environmental
study before bidding on property. Its the best insurance
you can buy, insists Rolfs. Its comparable to
having a home inspection before buying a residence. The Phase
One environmental study tells if there are contaminants on the
property. The owner is responsible for the proper removal of these
contaminants, whether or not he is the originator of the hazard.
And the removal of these wastes can be very costly.
The cost of the
Phase One study, according to Rolfs, ranges from $500 to $3,000.
Sometimes you can get the seller to pay, he says.
Barnhill suggests you check with local planning commissions to
see exactly what environmental studies should be undertaken before
deciding on a piece of land.
back
to top
Mistake #5. Failure to plan for adequate
parking.
This is one area many church planners overlook, to their detriment.
Barnhill says, There is no use building a 1,000 seat sanctuary
if you can park only 500.
Leave room
for growth,is the advice of Rolfs. If your lot is
full, visitors wont stop. Ward knows this to be true.
They have been in their new building for only two years, and already
their parking is overflowing.
We have 20
cars a week parking across the street, says Ward. On
Easter Sunday it was more than 40.
Most city zoning
codes call for a ratio of 1 car to every 4 seats when it comes
to planning parking. But both Ward and Barnhill believe a more
realistic ratio is 1-to-2 or 1-to-2.5. Its a mistake
to apply code requirements that are too low, says Barnhill.
back
to top
Mistake #6. Unrealistic projection of income
or inadequate cash on hand.
This sixth mistake can easily outweigh all the others up to this
point. You can have great planning, great drawings, a beautiful
and environmentally friendly site, and room for all the cars General
Motors will make in a year. Yet without proper financing, all
your plans will lie in a drawer gathering dust.
"Most churches
start by talking about their needs, states Barnhill. They
should start by talking about their financial capabilities. Based
on the size of the church, how much money can they realistically
raise and borrow?
In the lending
business, says Rolfs, we frequently get calls from
churches who are putting up a $2 million project. They have members
who have pledged $1 million over the next three years, so they
believe they need to borrow only $1 million.
But they dont
realize that contractors must be paid while the building is going
up, not three years from now. They must pay the interest on the
loan. Plus unexpected costs must be added in. Then take into account
that, historically, pledge collectability is only around 70 to
80 percent. The church has to be realistic about what it needs
to borrow to finance the project.
Ward experienced
this scenario firsthand. When we moved into the new building,
he recalls, we had a huge mortgage to pay, but hadnt
yet grown to where we could pay it.
And there is the
catch: A church cant grow in an outgrown or outdated building,
but while it is still small, it cant afford to build a larger
building to accommodate new growth.
Heres
how we suggest churches handle that dilemma, says Barnhill.
We encourage churches to start a capital funding campaign.
They should conservatively be able to raise one to 1-1/2 times
their annual giving. This is usually enough to make up the shortfall
in monthly expenses with the new mortgage until church growth
catches up with the need. You should have a 36-month cash-flow
bridge while the church is growing.
Rolfs also encourages
churches to be realistic about the sale of their existing site.
Church properties dont turn quickly, he says.
The normal marketing time for church property is 8 to 30
months. And, if you are in a smaller town, your prospects are
limited.
back
to top
Mistake #7. Getting on the bad side of
city government.
According to Barnhill, zoning issues for churches are getting
more and more testy.
I think its
Satans last attempt to retard the growth of the church,
he says.
Says Johnson, You
never want to make the city your enemy.
Weve
taken huge shots from the city. Fifty thousand dollars to install
storm water management when we first built, another $75,000 during
our second phase to correct it. They said it wasnt up to
specs- but it was their specs we followed in the first place!
Ward concurs, Weve
had mega-problems with the city. They are extremely inflexible
and legalistic. It would seem that friends like
these could easily become your enemies.
Be sure your
testimony extends to the city, exhorts Johnson. Were
here to minister to the city. We pray for the city officials.
This is one
area we did right, exclaims Ward. We responded to
objections raised at the zoning board hearing. There were concerns
raised about drainage, so we made improvements to the plans that
helped the situation in the whole neighborhood. We didnt
have to do that, but it created a win-win situation. And if the
city leaders want to take all the credit, let them!
back
to top
Mistake #8. Allowing the project to overwhelm
your life.
The very week Don Ward was to witness the dedication of his new
church building to the service of the Lord, he almost left the
church.
I got too
emotionally involved, he says. I felt I was carrying
it all on my back. As a result, my wife and I felt burned out.
I had a job offer the week before our dedication service.
He turned it down and is glad today he did.
It would have
been a mistake, he admits. We have had dramatic growth
since the dedication. I just didnt have a good infrastructure
under me in the church. Now we are talking expansion again, but
I wont make the same mistake. Ive told the church,
If you want to build, you do the work. Im not
even going to all the meetings.
back
to top
Mistake #9. Not praying for the construction
workers.
How easy it is for us to miss opportunities to see God work right
in front of us each day! Johnson was able to see Gods faithfulness
in answering prayer as the first phase of St. James was being
built in 1988.
We prayed
for the safety of the workers everyday, says Johnson. One
afternoon a carpenter put his foot through the roof and fell what
would have been about 40 feet. He reached out and grabbed a beam
in the sanctuary. One of our members walked in right then and
was able to get him down. What a miracle from our Lord! And that
worker was in church the next Sunday.
Perhaps not the
ideal church growth method, but if it works
back
to top
Mistake #10. Waiting to celebrate until
the building is complete.
Johnson tells how his church celebrates the completion of various
steps. For instance, when they had completed their fund-raiser
for the second construction phase, the church hosted a catered
dinner at a nice restaurant for all the adults in the congregation.
They held an Enlarge the Harvest concert one
Friday night just to gather the members in an attitude of praise
to God for His faithfulness thus far in the project.
And celebrate
big when you finish, suggests Johnson. Be sure to
recognize all those who helped make it possible.
JEFF DUNN is a free-lance
writer living in Dayton, Ohio.
Above was reprinted
with permission from MINISTRIES
TODAY.
Below has been updated
by ChurchPlansForLess by adding 2 more
mistakes to avoid.
Mistake # 11. Ordering that "On Sale
for a Limited Time Steel Building Package"
Many church boards are lured into the possibility of saving a
substantial amount of money by ordering a "package deal"
offered by steel building dealers. In many instances, the building
package has a limited number of door and window openings; any
additional openings create a heavy additional charge or surcharge.
These buildings are usually designed as a single story open structure
with a warehouse effect. The surcharge for increasing the steel
sizes to accommodate for future second floor expansions is again
very heavy. The steel members and panels that create the exterior
walls may also need to be re-sized depending on the requirements
of the final exterior finish whether it is brick masonry, stucco,
etc. We have assisted several churches that have purchased these"package
deals" only to discover the costs to upgrade doubles or triples
the original price for what they want or need. These costs can
equal or surpass regular steel building quotes.
Some churches have
purchased these kits without having the land to build upon. It
is much wiser to build from the ground up, than to buy a box and
build from the inside out.
Mistake
# 12. Failing to check for the need of a Registered Architect.
Lots of people will spend time to sketch and draw their building
themselves, planning for all they need in their church. But these
simple drawings and sketches (in most instances) will not allow
you to get building permits.
Most jurisdictions
require a registered architect, certified in their state to prepare
and stamp the plans before they will permit a project. This person
certifies to the state that the plans have been drawn correctly
and will be a structurally sound building. A registered architect
will also see that all of these requirements are met according
to the building codes. Often you can check with your county seat
government offices to find your local building authorities.
back
to top
|